Civil Engineering
Course Details

KTO KARATAY UNIVERSITY
Mühendislik ve Doğa Bilimleri Fakültesi
Programme of Civil Engineering
Course Details
Mühendislik ve Doğa Bilimleri Fakültesi
Programme of Civil Engineering
Course Details

| Course Code | Course Name | Year | Period | Semester | T+A+L | Credit | ECTS |
|---|---|---|---|---|---|---|---|
| 05381195 | Design of Wastewater and Urban Rain Water Collection Systems | 4 | Spring | 8 | 2+1+0 | 2 | 7 |
| Course Type | Elective |
| Course Cycle | Bachelor's (First Cycle) (TQF-HE: Level 6 / QF-EHEA: Level 1 / EQF-LLL: Level 6) |
| Course Language | Turkish |
| Methods and Techniques | Lecture, project |
| Mode of Delivery | Face to Face |
| Prerequisites | - |
| Coordinator | - |
| Instructor(s) | Prof. Mehmet Faik SEVİMLİ |
| Instructor Assistant(s) | - |
Course Instructor(s)
| Name and Surname | Room | E-Mail Address | Internal | Meeting Hours |
|---|---|---|---|---|
| Prof. Mehmet Faik SEVİMLİ | A-Z25 | [email protected] | 7486 |
Course Content
Design of sewage systems, Design of rainwater collection systems
Objectives of the Course
Learning the design of wastewater and urban rainwater collection systems.
Contribution of the Course to Field Teaching
| Basic Vocational Courses | |
| Specialization / Field Courses | X |
| Support Courses | |
| Transferable Skills Courses | |
| Humanities, Communication and Management Skills Courses |
Relationships between Course Learning Outcomes and Program Outcomes
| Relationship Levels | ||||
| Lowest | Low | Medium | High | Highest |
| 1 | 2 | 3 | 4 | 5 |
| # | Program Learning Outcomes | Level |
|---|---|---|
| P3 | Ability to design a complex system, process, device or product to meet specific requirements under realistic constraints and conditions; ability to apply modern design methods for this purpose. | 5 |
| P6 | Ability to work effectively in disciplinary and multi-disciplinary teams; individual study skills. | 5 |
| P7 | Ability to communicate effectively in verbal and written Turkish; knowledge of at least one foreign language; writing active reports and writing reports, preparing design and production reports, making effective presentations, giving and receiving clear and understandable instructions. | 5 |
Course Learning Outcomes
| Upon the successful completion of this course, students will be able to: | |||
|---|---|---|---|
| No | Learning Outcomes | Outcome Relationship | Measurement Method ** |
| O1 | Designs the sewerage system of a region, makes the drawings of the design, makes the design report, makes the presentation. | P.3.49 | 1,7 |
| O2 | Designs the stormwater removal system of a region, makes the drawings of the design, makes the design report, makes the presentation. | P.3.50 | 1,7 |
| O3 | Designs the sewerage system of a region, makes the drawings of the design, makes the design report, makes the presentation. | P.6.10 | 1,7 |
| O4 | Designs the stormwater removal system of a region, makes the drawings of the design, makes the design report, makes the presentation. | P.6.11 | 1,7 |
| O5 | Designs the sewerage system of a region, makes the drawings of the design, makes the design report, makes the presentation. | P.7.12 | 1,7 |
| O6 | Designs the stormwater removal system of a region, makes the drawings of the design, makes the design report, makes the presentation. | P.7.13 | 1,7 |
| ** Written Exam: 1, Oral Exam: 2, Homework: 3, Lab./Exam: 4, Seminar/Presentation: 5, Term Paper: 6, Application: 7 | |||
Weekly Detailed Course Contents
| Week | Topics |
|---|---|
| 1 | Basic engineering principles for wastewater and stormwater collection |
| 2 | Planning for wastewater and stormwater collection |
| 3 | Passing wastewater channels through a given parcel system, placing menhole |
| 4 | Calculation of flow rates |
| 5 | Making the calculations of the sewage system, finding the pipe diameters |
| 6 | Making drawings of the designed sewer system |
| 7 | Elimination of deficiencies in sewer design |
| 8 | Obtaining information about stormwater drainage systems |
| 9 | Establishment of stormwater drainage channel lines in a given district |
| 10 | Calculation of storm water flow rates |
| 11 | Making the calculations of the storm water system, finding the pipe diameters |
| 12 | Making drawings of storm water system |
| 13 | Elimination of deficiencies of the storm water system |
| 14 | Reporting Wastewater and Stormwater projects |
Textbook or Material
| Resources | Lecture notes, regulations |
Evaluation Method and Passing Criteria
| In-Term Studies | Quantity | Percentage |
|---|---|---|
| Attendance | - | - |
| Laboratory | - | - |
| Practice | - | - |
| Homework | - | - |
| Presentation | - | - |
| Projects | 1 | 40 (%) |
| Quiz | - | - |
| Midterms | - | - |
| Final Exam | 1 | 60 (%) |
| Total | 100 (%) | |
ECTS / Working Load Table
| Quantity | Duration | Total Work Load | |
|---|---|---|---|
| Course Week Number and Time | 14 | 3 | 42 |
| Out-of-Class Study Time (Pre-study, Library, Reinforcement) | 14 | 8 | 112 |
| Midterms | 0 | 0 | 0 |
| Quiz | 0 | 0 | 0 |
| Homework | 0 | 0 | 0 |
| Practice | 0 | 0 | 0 |
| Laboratory | 0 | 0 | 0 |
| Project | 14 | 3 | 42 |
| Workshop | 0 | 0 | 0 |
| Presentation/Seminar Preparation | 0 | 0 | 0 |
| Fieldwork | 0 | 0 | 0 |
| Final Exam | 1 | 20 | 20 |
| Other | 0 | 0 | 0 |
| Total Work Load: | 216 | ||
| Total Work Load / 30 | 7,20 | ||
| Course ECTS Credits: | 7 | ||
Course - Learning Outcomes Matrix
| Relationship Levels | ||||
| Lowest | Low | Medium | High | Highest |
| 1 | 2 | 3 | 4 | 5 |
| # | Learning Outcomes | P3 | P6 | P7 |
|---|---|---|---|---|
| O1 | Designs the sewerage system of a region, makes the drawings of the design, makes the design report, makes the presentation. | 5 | - | - |
| O2 | Designs the stormwater removal system of a region, makes the drawings of the design, makes the design report, makes the presentation. | 5 | - | - |
| O3 | Designs the sewerage system of a region, makes the drawings of the design, makes the design report, makes the presentation. | - | 5 | - |
| O4 | Designs the stormwater removal system of a region, makes the drawings of the design, makes the design report, makes the presentation. | - | 5 | - |
| O5 | Designs the sewerage system of a region, makes the drawings of the design, makes the design report, makes the presentation. | - | - | 5 |
| O6 | Designs the stormwater removal system of a region, makes the drawings of the design, makes the design report, makes the presentation. | - | - | 5 |
